Selection of Aviation Circuit Breakers - Wei Ke Wei - SAE Guide 7-step Selection

Step 1: Select the type of protective device

This is when selecting one of the following types of protective equipment: thermal circuit protection, fuses, arc fault protection devices, or distributed power control units.Each fuse has its own advantages and disadvantages (for example, the fuse has a faster tripping time, but can only be used once at a time), so it is necessary to understand the specific system requirements before choosing.


NASA航空斷路器選型規范


Step 2: Determine the operating environment

For space applications designed with flowcharts, the operating environment also includes considerations of vacuum and zero gravity, as this may affect the separation distance required to disconnect the circuit.For those who have more ground applications, the operating environment remains an important consideration.If the device operates in an uncontrolled environment or is a software controlled system,Then it should be consideredExpose itUnder electromagnetic interference (EMI) or high temperature.

Step 2a: Select device level

Determine the required current for the application without any modification factors.Information from FAA AC 43.13The meaning of circuit breaker and the wire size of the wire system are provided. Please note that this rating information is based on the maximum size circuit protection of the given line gauge. This will provide a starting point for the selection of wire/circuit protection dimensions.

Step 2b: Select the adjusted device level

The adjusted equipment rating is based on the environmental factors determined in step 2.just asAs discussed in EWIS's "LECTROMEC Derating Tool Tutorial"The operating height will affect the given current carrying capacity of the wire harness.

Step 3: Determine the device level to be used

Determine which option requires the widest range of operating environment conditions based on the choice between 2a and 2b;This may be a combination of the two.

Step 4: Calculate the maximum temperature difference/temperature (DT) of the wire

The label is slightly incorrect - it should say the maximum/minimum temperature of the wire/cable.The limiting factors can be insulation or conductors.Regardless of the method, it is important to understand the scope of the system's operation.This step should also include evaluating wire support equipment, such as joints and connectors.

Step 5: Operating environment/Determine ambient temperature

This step can be used in conjunction with step 4, but it includes an evaluation of the ambient operating temperature of the area.The inspection in this area should also cover nearby systems, equipment, and pipelines to determine if there are any heat sources that may affect the temperature of the wires.The results of this step should be applied to determine the current derating (such as AS50881 and EWIS)As described in the "LECTROMEC Derating Tool Tutorial".

Step 6: Voltage Drop Assessment

The isolation from the power bus to the powered device will affect the voltage seen by the final device.Smaller sized wires (such as 24) have a resistance of 2.5 ohms per 100 feet.

In this step, it is recommended to determine the routing separation distance in the system and determine the voltage drop.These suggestions can be found in AS50881.

Step 7: Add line gauges

According to the evaluation results, it may be necessary to increase the line gauge to meet the required voltage drop and current carrying requirements of the system.If a new wire gauge/circuit protection pairing is selected, return to step 2 and repeat the exercise.

This process may seem too complicated, but it is necessary to address the issue of the correct size of the wires and corresponding circuit breakers.Small wires may act as heat sources and/or reduce the functionality of connected devices.Excessive circuit protection may not be able to protect the wire interconnect system and may not respond in many fault situations.

Determine which option requires the widest range of operating environment conditions based on the choice between 2a and 2b; This may be a combination of the two.

The above flowchart is excerpted fromNASA Technical Memorandum 102179-1991.This chart provides a flowchart of design considerations for circuit protection, starting from determining current requirements and ending with system implementation. The following 7 steps will discuss the flowchart in more detail.






tag: 斷路器
主站蜘蛛池模板: 成人a毛片免费视频观看| 免费久久久久| 高清国产精品久久| 韩漫一区韩漫二区无遮挡| 一级午夜免费视频| 久久w5ww成w人免费不卡| 欧美日韩在线视频观看| 精品一区二区三区在线视频| 99视频福利| 国产系列欧美系列日韩系列在线 | 日韩欧美亚洲乱码中文字幕| 国产免费黄色| 免费一区视频| 亚洲精品第一综合99久久| 日本美女一级片| a v视频| 国产成人18黄网站在线观看网站 | 午夜看黄网站免费| 色综合久久精品中文字幕| 成人精品在线| 精品日韩| 4hc44四虎www视频| 精品国产一区二区三区www| 欧美激情伦妇在线观看| 天天干天天爽天天射| 国产亚洲欧美日韩在线观看不卡| 欧美一级高清视频在线播放| 欧洲精品在线观看| 精品免费视频| 青青草这里只有精品| jizz亚洲高清在线观看| 青草青草久热精品观看| 亚洲第一页视频| 成人精品在线视频| 99爱视频在线观看| 黄视频在线免费| 日韩高清第一页| 国产成人18| 青青青免费在线视频| jizzjizz4| 伊人久久大香线|